FACTORY TOUR

Factory Tour

Assembly

In the first stage of final assembly, the hull is prepared to receive the pre-rigged deck. The finished deck is then lifted and set on the hull, much like a cap, and checked for proper fit. Then the deck is thru-bolted to the hull using stainless steel bolts and nuts. This ensures that any flex in the joint will be so minimal that the watertight gasket/caulk seal, made in the last step of installation, will not be broken or violated. A heavy-duty, three-piece extruded nylon rub rail, which is both attractive and functional, is installed with stainless steel fasteners to finish the marriage of the Parker hull to the deck.



Glass Cutting Grinding Booth Pre-Assembly Wood Shop Gelcoat Booth Final Finish Assembly Lamination Mold Maintenence